July 26, 2010

Drained

Finished the plumbing installation in the darkroom proper.  Another minor milestone, of sorts.  One must take the small victories when they present themselves, after all.

I had given a lot of prior thought to how to do the plumbing, then as I was into it, had multiple second thoughts about it all. The overriding concept was to have everything exposed, both for maintenance and potential future changes. At times over the past few days, I wished I had done proper in-wall design, but I did not, so “oh, well”.

I had planned from the beginning to have the two sinks. (see the floor plan in the Feb. 28th post) The water supply lines come out of the wall near the corner and to the left of the wet side. This location was dictated by where the lines come up from the lower floor. Once out of the wall, they move laterally along the wet side to supply both sinks.

The shorter, 4’ sink on the right has three faucets built in. The 8’ sink has no built in faucets. In the old darkroom, the long sink had 3 faucets mounted above it on the wall. I could still do this, but with the addition of the 4’ temp control sink (not present in the old darkroom) multiple faucets on the 8’ are not necessary. I have gone back and forth about even mounting a faucet on the 8’ and at this point have not, but there are stub-outs in the water line directly under the sink and I can add one at a later date. In the meantime, I plan on just having a long enough hose from one of the 3 faucets in the other sink. The longer sink is for print trays. The short sink, with it’s temperature control (given the later addition of heated water) will be for all chemical mixing, film processing, and washing.

Although faucet-less, the long sink still has a drain. Once into this, I really wished I had roughed in a proper drain pipe in the wall for both sinks. However, in the “design” stage, some months ago, I envisioned hooking up both sinks just like a double kitchen sink into the one drain. What I did not consider, was that in a kitchen sink, the two drains are about 18-24 inches apart, generally symmetrical and on the same level. In this case, the two drains are a bit over 6 feet apart, the long sink bottom is higher than the other sink, and the drain is further from the wall. So, there was a bit of improvisational engineering as I installed this. For one thing, the drain pipe was very heavy in that long of a span, and had to be creatively supported. Also, this long of a drain span needed to be off-level a bit to ensure that it drained properly. (Both would have been easily facilitated had I put it in the wall.) A “tee” and a 45 degree connection and I got it done. But, let us all learn from my mistakes!

I did have enough foresight to put a union connection in the drain pipe between the two sinks so that either sink could be removed separate from the other for maintenance. This has already proved useful since one of the supply hoses for the faucets had the wrong fitting and I had to pull the sink back out to get to it for exchange.

The hot water side is still “prepared for”. The lines are there, but no water – yet. The hot side is capped off below the floor. If and when I put in a heater, all of the lines, electrical and space is there, waiting.

Still have to get the water line to the building and the rain barrel set up for the drain. The rain barrel has been purchased and the drain is run, just need to install and hook-up. I’ve changed my mind about the supply line, at least for now. I had intended to run a pex line underground from the main house. I may do this eventually, but for now, there is a main junction of the sprinkler system not 3 feet from the darkroom building. I am going to tap in there for the time being.

So, it will be operational as it sits, with potential changes in the supply lines, addition of hot water, and maybe another faucet all possible down the road.

July 18, 2010

The vision thing.

Actually hit a lick on the darkroom this morning. Not much, but at least I started.

In June, I had three consecutive weeks of business travel scheduled and I knew that would put the darkroom project on hold for a bit. However, in the second week, I had some visual symptoms that I recognized from past experience. The following Monday, I visited my ophthalmologist and was promptly sent over to the surgeons. (Didn’t make the third week’s trip.)

I had surgery for a detached retina in my left eye four weeks ago. I am fine, now, but there has been all this time where my vision is effected and my energy level reduced. The vision will clear up and there should be no long term effects.

But, in the meantime, there has been six weeks total with no progress on the darkroom! Re-starting will be slow (still can’t see as well as I’d like), but at least I’m moving again.

I also apologize for not keeping up with the blog. I had an un-moderated comment from a month ago! I’ll do better. (Also, to the commenter: Sorry, but I can’t help you at this time.)

Stay tuned.

July 16, 2010

The Woodpecker

A few years ago, at the old house, there was an incident with a woodpecker who attacked rotting siding on the building housing my darkroom and my wife's studio.  We had built this building on the back of our lot.  The siding was an alleged high-tech engineered material that would not rot or deteriorate.  Yeah, right.  Note the green mold, as well as the holes.

The rot attracted the bird, and the bird drilled numerous holes.  I filled the holes with expanding foam sealant as a temporary measure, and then had to cover the rotted area with cedar boards.  At least the cedar matched the rest of the trim on the building and once it weathered it looked as if it had always been there.  Just before we moved last year, we painted the building and it looked super ...

The incident, for some inexplicable reason, awakened the inner plagiarist in me; and I re-fashioned Poe's The Raven into The Woodpecker.  See the link to the right under "pages".

Only tangentially related to building the new darkroom, but hey.  Enjoy ...


June 26, 2010

Time to update the blog.

There has been no progress since the last installment. First, I was on the road on business for a couple of weeks. While I get home on weekends, invariably I have to catch up on things that were not done during the week and get very little “hobby” work in.

I was scheduled to be gone again this past week, but instead, ended up with a medical emergency. I will survive, but I am not able to work on the darkroom and probably won’t for a while yet.

I hope if you are a regular follower you aren’t too discouraged. I’ll get back to this.

June 8, 2010

Sinks, etc.

Wow!  There is a bit more room in my garage and shop now that the darkroom stuff is in the darkroom.  Not 100% moved in, but mostly.

Things are a ways from being finished, of course.  The plumbing is still not hooked up, although the sinks are in place, there are cabinets to build, and shelves and racks to put up.  Then, placement of safelights, and a dozen or so other small things.  Still, it's getting there.

EDIT:  Someone left a comment asking if the printwasher is home-made.  No, it is a 11x14 Versalab.  The stand, I did make.  I also made the stand for the longer sink.

http://www.versalab.com/server/photo/products/washer1.htm


Yes, Suzanne, it is starting to take shape.  Just not done yet.  I am on the road (for work) most of this month, so it may still be a while. 


June 1, 2010

A milestone

I declare the "construction phase" finished!

Over the long weekend, I started moving in sinks, shelving, enlarger chassis, etc.  Still a lot of work to do, but the visiable progress should be faster and the blog a little more interesting.  I appreciate any of you that have actually followed this since February.  You must be bored.


Some panos:

I own a swing-lens panoramic camera.  I had never shot color film in it before until I decided to do some documentation of the darkroom construction.  I had to wait until I finished up the roll and then got it processed.  (No irony there ...)

I am just not very practiced at scanning and I am afraid that the results are disappointing.  Never mind the color balance from the different lighting.  But here they are anyway to show some before and after.  I had even less luck stitching digi shots (see Feb 15 post on the blog), but this is still not much better than rough illustration.  Oh, well.  My analog printing is much better and that is why I'm building the darkroom!




May 28, 2010

Trim carpentry

The last of the things that need paint – with any luck.

The baseboards went fairly smooth. There was one piece that had to be scribed and cut on the bottom edge due to an inexplicably high hump in the tile floor. There were several other places where the tile wasn’t perfectly level (it never is) but not enough that caulk wouldn’t hide it.

There is the usual trim (casing) around the door, and then some molding where the new drywall comes against the old drywall in the slanted ceiling at a 45 degree angle. Rather than trying to get fancy with a taped 45 degree joint, I concluded that molding would be the ticket. Why not?

With this, it truly is a big, empty white room!